The excavating crew marked the walls to apply the waterproofing compound and then installed the drain tile.
Later today a large truck arrived at the site with the 1000 gallon septic tank. It was installed and the distribution box was placed in the designated area.
Now the drain field has to be installed and inspected by the county health department. Hopefully next week we will see some framing taking place.
No comments:
Post a Comment